home profile services projects clients quality & safety contact us careers
 
Mirfa Extension 22MIGD Desalination Plant
Mirfa Extension 22MIGD Desalination Plant
 
Mirfa Extension 22MIGD Desalination Plant
Mirfa Extension 22MIGD Desalination Plant
 

Also completed by ACC is the 23 MIGD Mirfa desalination plant which serves the southern areas of the Abu Dhabi region. It is comprised of three Multi-Stage Flash (MSF) distillers, each with a capacity of 7.5 MIGD. The steam is provided by two boilers.

The scope of works for the 30,000 cubic metres of concrete project also included a 650 metre cable tunnel, a 2.5 kilometre long, 2.8 metre diameter discharge pipe, 65 metre diameter steel tanks, a seawater intake structure and an outfall structure.

 
«back to menu