The scope of works on the ACC subcontract includes civil, structural,
building and external works and the outfall channel for both the
power and desalination elements.
The Umm Al Nar IWPP involves Arabian Power decommissioning the
existing 850 MW of generating capacity at the site and installing
1,550 MW of new build to be constructed by Toshiba and based on
Frame 9 gas turbines from the US General Electric Power Systems
(GE). In addition, 25 million gallons a day (g/d) of new multi-stage
flash (MSF) capacity will be added by Japans Hitachi Zosen
Corporation to the plants 70 million g/d of recently-installed
capacity.
|