|
The Etisalat Al Ain building is the Corporation's main office in
Al Ain, UAE. ACC was the main contractor for the project which was
completed in September, 2001.
The building incorporates modern materials and construction techniques
with elements of traditional design.
The basement houses an impressive 192 seat auditorium with advanced
audio-visual equipment. The first floor is finished in polished
granite and stainless steel and contains public reception areas
and payment counters. Corporate offices were completed on the second
floor.
Smart building capabilities include CCTVs, an integrated access
control system and an advanced Building Management System. The building
is linked to the rest of the city's telecom network via a duct bank
located in a designated chamber in the basement.
|