Installation of NGL Pipeline Pumps and Allied Works at Asab-0

The NGL Pipeline Pumps & Allied Works project at Asab-0 involved installation of NGL pumps with associated civil, piping, electrical, instrumentation, telecom and tie-ins works. It also included testing, pre-commissioning and assistance to the company for commissioning and the startup of new facilities.

The purpose of the project was to replace existing NGL pipeline pumps with new ones of bigger capacity to cater for increased production and to carry out debottlenecking of the existing plant to facilitate the operation of the new pumps.
The scope included construction of pump sheds to accommodate new NGL pumps and VSD motors; a new substation building with 11kV and LV power system for operation and control of the new facilities; piping fabrication installation and testing; modification of existing electrical panels and DCS system; executing tie in works under a major shutdown to integrate the new facilities with the existing plant; removing the old pumps and demolishing existing facilities after successful operation of new installations.